Utility scale solar farm construction near Abilene, Texas

West Central Texas made its name in wind power, with the Sweetwater and Abilene area home to some of the largest wind farms in the country. Now solar and battery storage are following the same transmission lines. According to the U.S. Energy Information Administration, developers have reported about 6,900 megawatts of new solar and 3,200 megawatts of battery storage planned through 2029 in the counties around Abilene, including Haskell, Jones, Nolan and Stonewall. That makes it one of the biggest solar build-outs in Texas. For EPCs and developers, the challenge is getting enough skilled crews to remote sites and keeping them productive.

STG Solar has installed 1.79 gigawatts of utility scale solar since 2015, across more than 64 projects. We bring self-performing electrical, mechanical, medium voltage and fiber optic crews to solar farms around Abilene and across Texas.

Why West Central Texas Is a Demanding Place to Build Solar

Distance is the first challenge. Many sites are far from town, with long drives for crews and deliveries. A subcontractor here has to travel well, house crews nearby and keep materials flowing so work never waits on a truck.

The ground is the second. Rocky caliche and hard, dry soil are common, and they slow pile installation and trenching. Crews need the right equipment and realistic production plans based on the site's geotechnical report.

The weather is the third. West Central Texas brings intense summer heat, strong winds, blowing dust and sudden spring storms with hail. Wind affects module handling and lifting, heat affects crew safety and storms can damage materials left exposed. Every job needs a safety and weather plan.

Our Utility Scale Solar Services Around Abilene

We self-perform the core trades on a solar farm, so you manage fewer subcontractors and fewer handoffs.

We can take a full scope or add crews to support yours. As much or as little as you need.

Battery Storage and Commissioning

About 3,200 megawatts of battery storage are planned around Abilene, with the largest share in Haskell County. Many of these projects will sit beside solar or wind farms and share a substation. Our crews build the electrical side of BESS projects and support testing through energization. See our BESS construction in Dallas, TX page and our solar and BESS commissioning services.

Why EPCs and Developers Choose STG Solar

We've kept our homegrown roots and our core values: honesty, integrity and quality workmanship. We show up with the crew size we promised, we tell you early when something's off and we don't leave a punch list behind.

  • We self-perform electrical, mechanical, medium voltage and fiber optic work
  • We've built more than 64 utility scale projects in 10 years
  • Our crews travel nationwide, Texas is a major focus and we stay productive at remote sites
  • We plan for rock, wind, heat and distance from the start
  • We test as we go, so the commissioning team gets clean records

How a Solar Project Works With STG

  1. Scope review. We walk the drawings, schedule and crew needs with your team. We generally recommend about 90 days of lead time.
  2. Mobilization. We staff the crew size the schedule calls for, set up laydown and get safety plans in place.
  3. Installation. Piles, racking or trackers, modules, DC and AC wiring, medium voltage and fiber, block by block.
  4. Testing as we go. Torque, polarity, insulation and continuity are checked and documented as each block finishes.
  5. Energization support. We work with the commissioning team and the utility through startup.
  6. Clean closeout. Test records, a closed punch list and a site ready for operations and maintenance.

Frequently Asked Questions

Which counties around Abilene do you work in?

We work across West Central Texas, including Taylor, Jones, Haskell, Nolan, Fisher, Stonewall and Shackelford counties, and anywhere else your project is. Our crews travel nationwide.

Can your crews work at remote sites?

Yes. Most utility scale projects are far from town. Our crews are used to traveling, staying on the road and keeping production steady at remote sites.

How do you handle high winds during module installation?

We follow the module and tracker makers' wind limits, plan lifts and installation around the forecast and secure materials and partly built rows before wind picks up.

Can you take only part of the scope?

Yes. Some clients hire us for the full electrical and mechanical scope. Others need medium voltage, fiber or extra crews to hold a schedule.

Do you build battery storage too?

Yes. We build the electrical side of battery storage projects, including storage paired with solar. See our BESS Systems page.

Why is solar growing where the wind farms already are?

West Central Texas already has high-voltage transmission built to carry wind power, plus strong sun and wide open land. Solar and storage can share that grid access, and batteries help smooth out both wind and solar output.

Build Your West Central Texas Solar Farm With a Crew That Delivers

West Central Texas has some of the biggest solar and storage plans in the state. STG Solar brings self-performing crews and gigawatts of utility scale experience to every project we take on.

Request a bid to talk about your Abilene-area solar project.