Self-Performed BESS Construction, From Foundations to Energization

Battery energy storage is the fastest-growing part of the utility scale energy market, and it's where STG Solar is putting its crews. Developers and EPCs need a contractor who can set equipment, run the cable, terminate it right and hand off a site that passes inspection the first time. That's the work we've done on solar farms for a decade, and it's the work a battery site demands.

1.79 GW installed since 2015 | 64+ utility scale projects | 428 MWdc in the pipeline | Electrical, MV and fiber self-performed

Request a Bid

Why STG Solar for Battery Storage

A battery site is an electrical job first. The containers and racks arrive mostly built from the factory. Everything between them and the substation is field work: grounding, cabling, terminations, medium voltage, communications and testing.

Our crews already self-perform electrical, mechanical, medium voltage and fiber optic work on utility scale solar farms. That means fewer handoffs, fewer lower-tier subs and one crew that's accountable for the whole electrical scope.

Our BESS Construction Scope

We can take the full electrical scope on a storage project, or add crews to support yours. As much or as little as you need.

  • Foundations, embedded conduit and grounding grid installation
  • Setting battery containers, inverters and power conversion systems (PCS)
  • DC cabling between battery enclosures and the PCS
  • AC cabling, terminations and torque checks
  • Medium voltage collection system and step-up transformer connections
  • Auxiliary power for HVAC, fire detection and controls
  • Fiber optic and SCADA communications for the battery management system and plant controller
  • Testing and support through energization and commissioning

Built to the Codes That Matter in Storage

Battery sites carry stricter rules than solar, and inspectors know it. Our crews build to NFPA 855 for stationary energy storage, NEC Article 706 for energy storage systems and NFPA 70E for electrical safety, along with the equipment maker's installation manual and the local fire code.

Code-compliant spacing, labeling, grounding and documentation aren't extras on a battery site. They're the difference between passing inspection and losing weeks. Read more in Why BESS Construction Is Harder Than Solar.

Solar Plus Storage

Many new battery projects sit beside solar farms and share a substation and interconnection. With gigawatts of solar experience, we know how those sites are built and energized. We can tie storage into an existing collection system and keep the solar side producing while the batteries go in.

How a BESS Project Works With STG

  1. Scope review. We walk the drawings, schedule and interconnection dates with your team.
  2. Mobilization. We staff the crew size the schedule needs and set up safely on site.
  3. Installation. Foundations, equipment setting, cabling, medium voltage and communications.
  4. Testing as we go. Insulation, continuity, torque and communications checks as each area finishes.
  5. Energization support. We work with the battery maker's field team and the utility through startup.
  6. Clean handoff. Test records, closed punch list and a site ready for operations and maintenance.

Where We Build

Our crews travel nationwide. Wherever your battery storage project is, we'll staff it, mobilize and build it. Texas is a major focus for us, with BESS construction in Houston, TX and across the ERCOT market, the busiest storage market in the country. Tell us where your site is and when it needs to be energized.

Frequently Asked Questions

Can STG Solar take only part of a BESS scope?

Yes. Some clients hire us for the full electrical scope. Others need medium voltage, fiber or extra electricians to hold a schedule.

Do you work with the battery manufacturer's team?

Yes. Battery makers send field service teams for startup and testing. Our crews prepare the site, finish the electrical checks and work alongside them through energization.

Can you add battery storage to an existing solar farm?

Yes. We can tie into the existing collection system and substation while the solar side keeps producing.

What does STG need to quote a BESS project?

Drawings, the equipment list, the site location and the target energization date. Send what you have and we'll take it from there.

Talk to Us About Your Storage Project

STG Solar brings honesty, integrity and quality workmanship to every site we build. If you're planning a battery storage project or adding storage to a solar farm, we'd like to help you get it energized on schedule.

Contact us about BESS construction