Utility Scale Solar in Corpus Christi, TX

Corpus Christi is one of the biggest energy ports in the country, shipping crude oil and natural gas around the world. The flat ranch and farm land of the Coastal Bend is now adding a new kind of energy. According to the U.S. Energy Information Administration, developers have reported about 1,600 megawatts of new solar and 900 megawatts of battery storage planned through 2029 in the Coastal Bend, led by Nueces County, with more in Refugio, Bee, Duval and Kleberg counties.
STG Solar has installed 1.79 gigawatts of utility scale solar since 2015, across more than 64 projects. We bring self-performing electrical, mechanical, medium voltage and fiber optic crews to projects around Corpus Christi and across Texas.
Why the Coastal Bend Is a Demanding Place to Build Solar
Hurricanes are the biggest risk. Hurricane Harvey made landfall near Rockport in 2017 as a Category 4 storm, just up the coast from Corpus Christi. Equipment pads, conduit sealing, racking attachment and storm plans all matter on the Coastal Bend.
Salt air, wind and heat are constant. Coastal moisture speeds up corrosion, steady Gulf winds affect module handling and lifting and summers are long and hot. Terminations, hardware and crew safety plans have to be built for these conditions.
The ground is flat but tricky. Clay soils near the coast can turn soft and sticky after rain, while sites farther inland can be sandy or caliche. Crews need to read each site and plan pile and trenching work around it.
Our Utility Scale Solar Services in Corpus Christi
We self-perform the core trades on a solar farm, so you manage fewer subcontractors and fewer handoffs.
- Electrical: DC string wiring, combiners, home runs, inverters, AC collection, grounding and testing
- Mechanical: pile layout, fixed-tilt racking, single-axis trackers and module installation
- Medium voltage: collection cable, splices, terminations, transformers and MV cable testing
- Fiber optic: SCADA fiber installation, fusion splicing and OTDR testing
- Operations and maintenance and 24/7 emergency response after storms
We can take a full scope or add crews to support yours. As much or as little as you need.
Battery Storage and Commissioning
About 900 megawatts of battery storage are planned around Corpus Christi, with most of it in Nueces County. Our crews build the electrical side of BESS projects and support testing through energization. See our BESS construction in Houston, TX and BESS construction in San Antonio, TX pages.
Why EPCs and Developers Choose STG Solar
We may be one of the larger utility scale contractors in the Southeast, but we've kept our homegrown roots. Our core values are honesty, integrity and quality workmanship. That means we show up with the crew size we promised, we tell you early when something's off and we don't leave a punch list behind.
- We self-perform electrical, mechanical, medium voltage and fiber optic work
- We've built more than 64 utility scale projects in 10 years
- Our crews travel nationwide, with a main focus on the Carolinas, Virginia and Texas
- Our crews travel nationwide, Texas is a major focus and we stay productive at remote sites
- We test as we go, so the commissioning team gets clean records
How a Solar Project Works With STG
- Scope review. We walk the drawings, schedule and crew needs with your team. We generally recommend about 90 days of lead time.
- Mobilization. We staff the crew size the schedule calls for, set up laydown and get safety plans in place.
- Installation. Piles, racking or trackers, modules, DC and AC wiring, medium voltage and fiber, block by block.
- Testing as we go. Torque, polarity, insulation and continuity are checked and documented as each block finishes.
- Energization support. We work with the commissioning team and the utility through startup.
- Clean closeout. Test records, a closed punch list and a site ready for operations and maintenance.
Frequently Asked Questions
Which counties around Corpus Christi do you work in?
We work across the Coastal Bend and South Texas, including Nueces, San Patricio, Refugio, Bee, Kleberg, Jim Wells and Duval counties.
How do you build for hurricanes?
We build to the engineer's wind and drainage design, seal conduit, secure materials before storms and offer 24/7 emergency response afterward.
Can you take only part of the scope?
Yes. Some clients hire us for the full electrical and mechanical scope. Others need medium voltage, fiber or extra crews to hold a schedule.
Do you build battery storage too?
Yes. We build the electrical side of battery storage projects, including storage paired with solar. See our BESS Systems page.
How do you handle high winds during installation?
We follow the module and tracker makers' wind limits, plan lifts around the forecast and secure partly built rows before wind picks up.
How do you protect equipment from salt air?
We install terminations, seals and hardware to the manufacturer's specs for coastal environments and check them carefully.
Build Your Next Solar Project With a Crew That Delivers
The Coastal Bend has thousands of megawatts of solar and storage on the way, and the coast doesn't forgive shortcuts. STG Solar brings self-performing crews and gigawatts of utility scale experience to every project we take on.
Request a bid to talk about your project.